What We Do

Services

Every job we quote falls into one of these, or close to it.

Home › Services

Everything we take on

Every job below is one we do ourselves across Temple Terrace.

Deck Installation

We build decks on pressure-treated pine framing or construct the whole deck in composite, depending on how much maintenance you want down the road. Footings go below grade to bear on solid soil, not the loose sand on top, and every ledger board gets properly flashed so water doesn't track into your house rim joist.

Custom Deck Design

Multi-level decks, built-in bench seating, a pergola over part of the deck for shade, whatever the yard and budget call for. We'll walk the lot with you and talk through board direction, joist spacing, and where the stairs actually make sense before anything gets drawn up.

Deck Repair

Soft spots in the decking, a railing that wiggles, joists gone soft from standing water, we see all of it. Most repairs come down to one rotted ledger board or a few joists that never had proper flashing, so we fix the cause, not just the board on top.

Deck Staining & Sealing

Florida sun and afternoon storms are hard on exposed wood, and an unsealed deck can start graying within a year. We pressure wash first, let it dry fully, then apply a penetrating sealer or solid stain depending on how much grain you want showing.

Composite Deck Installation

Composite boards skip the staining and hold up better against termites than untreated pine, which matters in this part of Florida. The framing underneath still has to be sized right, composite is heavier than wood and sags more between joists if the spacing is off.

Deck Railing Repair & Installation

Loose balusters and wobbly posts are usually a sign the post was never bolted through the rim joist correctly in the first place. Florida code calls for baluster spacing under 4 inches and rail height at 36 inches minimum, and we build to that whether it's a full replacement or a repair.

Pool Deck Construction

Decking around a pool needs boards spaced for drainage and fasteners rated for constant moisture and chlorine splash. We keep the deck height and slope right so water runs off instead of pooling against the house or the pool coping.

Deck Resurfacing

If the frame is solid but the boards are cupped, splintering, or just worn out, resurfacing replaces the decking without rebuilding the structure underneath. It's a faster job than a full rebuild and worth doing if the joists check out sound once we get under there.

Deck Demolition & Removal

Old decks sometimes sit on footings that don't meet current code, or on framing that's rotted past saving. We tear it out, haul off the lumber, and check what's left of the footings before anything new goes in.

Patio & Deck Covers

A cover over part of a deck or patio cuts the afternoon sun enough to actually use the space in July. We frame it to tie into the existing structure and the house roofline so it doesn't look bolted on as an afterthought.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Temple Terrace, FL

We bring the same crew and materials to every town on this list.

Temple Terrace, FL
Tampa, FL
St. Petersburg, FL
Clearwater, FL
Lakeland, FL
Brandon, FL
Riverview, FL
New Port Richey, FL
Wesley Chapel, FL
Zephyrhills, FL
Plant City, FL
Dunedin, FL
Common Questions

Things worth asking

Questions that come up once a project is underway.

Do I need a permit to build a deck?
Most counties around Tampa Bay require a permit for any deck attached to the house or raised more than about 30 inches off grade. The permit gets pulled and required inspections scheduled as part of the project.
How long does it take to build a deck?
A standard single-level deck, around 300 to 400 square feet, usually takes one to two weeks from the first footing to the final board. Multi-level decks, pool decks, or anything with a roof or pergola attached take longer.
Can you build to a specific budget?
Yes, telling us the budget up front lets the size, decking material, or railing style get adjusted to fit it rather than scaling back on footings or framing. The structure underneath isn't the place to cut cost.
Do you guarantee your work?
Framing and workmanship on every deck is backed by a labor warranty, with specific terms included in the written quote. Composite decking also carries its own manufacturer warranty separate from the labor warranty.
Who will I be dealing with during the project?
You deal directly with the crew doing the work, not a sales rep who disappears once the contract is signed. Questions about progress or changes go straight to the people on site.
What materials do you use?
Decks are built with pressure-treated pine rated for ground contact where it touches soil, or composite decking from brands like Trex or TimberTech for homeowners who want to skip staining. Fasteners are stainless steel or hot-dipped galvanized, since coated deck screws rust out too fast in Florida humidity.
Can I stay in my house during the build?
Yes, deck construction happens outside the house and doesn't require moving out, though there's noise from saws and nail guns during work hours. Access to the yard near the build area gets limited while footings cure.
What should I do to prepare the site before work starts?
Clear furniture, grills, planters, and anything else off the existing deck or the area where the new one goes before the crew arrives. If there's a sprinkler system or buried line near the footing locations, flagging it ahead of time helps avoid digging into it.
What happens if rot or termite damage turns up once the old deck is torn out?
If rotted framing, a bad footing, or termite damage turns up once old decking comes off, work stops and the problem gets shown before anything continues, then quoted as a separate repair. This is common on older decks, especially around the ledger board where water collects.
How do I maintain a new deck once it's finished?
Pressure-treated pine needs re-staining or sealing roughly every one to two years in Florida sun, while composite decking mainly wants an occasional wash to clear pollen and mildew. Either way, the spot where the deck meets the house is worth checking first, that's where water damage shows up earliest.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (352) 646-2284